Currencies:
Home ::  Pet Supplies ::  Dogs ::  Collars, Harnesses & Leads ::  Hi Kiss 6ft 30ft 50ft 100ft 160ft 200feet Black Extra Long Line Training Dog Leash - For Large,Medium and Small Dogs - Long Lead - Great for Training, Play, Camping, or Backyard - 200FT B075GK49F5

  • Hi Kiss 6ft 30ft 50ft 100ft 160ft 200feet Black Extra Long Line Training Dog Leash - For Large,Medium and Small Dogs - Long Lead - Great for Training, Play, Camping, or Backyard - 200FT B075GK49F5

  • Price: £77.11  £34.10
    Save: 56% off
    • Model: B075GK49F5
    • 551 Units in Stock

  • Please Choose:


    Add to Cart:
  • NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for small and medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more.
  • DIMENSIONS - This dog leash measures by 200 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
  • LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed.Allows you to teach your dog recalls and other obedience skills.
  • THICKENED HANDLE:Handle is made from advanced diving material, more comfortable and wearable
  • CHECK OUT ALL OF OUR TRAINING LEASHES - Click on the ZHIXUANKE link under the title to view all our popular training products.
  • Manufacturer warranty will not apply. Please review ’s return policy, which usually offers free returns within 30 days of receipt.


Product description

Size Name:200 Ft

-



Product information

Size Name: 200 Ft Technical Details
Pet TypeDog
Item Weight998 g
Package Dimensions33 x 32.3 x 4.3 cm
Item model numberSZZXK-DOGLEASH-20170809-001-06
ColourBlack
Size200 Ft
Number of Items1
Quantity1
Batteries RequiredNo
Batteries IncludedNo